Fairgrounds Road Bridge

ROSENBERG (Covering Fort Bend News) - The Fairgrounds Road Bridge Reconstruction Project has been completed by the Texas Department of Transportation and is now reopen for access. The original wooden bridge was replaced with a new concrete bridge structure. The bridge is open for area access including the Fort Bend County Fair which begins on Sept. 27.

This project was completed by TxDOT with participation from the City of Rosenberg. The TxDOT Off-System Bridge Replacement Program provides 80 percent Federal, 10 percent TxDOT and 10 percent city funding for the project. For this project, the city received credit for drainage structure improvements made on Louise Street at Dry Creek in lieu of the 10 percent cash match.

Recommended for you

(0) comments

Welcome to the discussion.

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.