University Roadway repairs

Image courtesy of Missouri City. 

MISSOURI CITY (Covering Fort Bend News0 – Missouri City’s contractor Brooks Concrete, will be doing enhancements on southbound University Boulevard at Highway 6 beginning Monday, Oct. 21.

Crews will be on-site from 9 a.m. doing repairs on the outside lane on southbound University Boulevard and then switch to the inside lane. The road could be down to one lane throughout this construction; work is expected to be complete by Friday, Oct. 25 pending good weather. 

Delays are expected in this major intersection during this period. Motorists are advised to avoid the area and take alternate routes if possible, or use extreme caution if travelling through the intersection.  

For more details or to talk to a staff member about the project, call 281-403-8500.

Recommended for you

(0) comments

Welcome to the discussion.

Keep it Clean. Please avoid obscene, vulgar, lewd, racist or sexually-oriented language.
PLEASE TURN OFF YOUR CAPS LOCK.
Don't Threaten. Threats of harming another person will not be tolerated.
Be Truthful. Don't knowingly lie about anyone or anything.
Be Nice. No racism, sexism or any sort of -ism that is degrading to another person.
Be Proactive. Use the 'Report' link on each comment to let us know of abusive posts.
Share with Us. We'd love to hear eyewitness accounts, the history behind an article.